Founding Filing Partner
Fifteen facilities. One filing season. Founding terms.
Your CY2026 report is due 31 March (Germany) or 15 May (EU) 2027. We are taking fifteen facilities through it as Founding Filing Partners: done properly, at a founding rate locked for as long as you stay.
What you get
- 01
Your CY2026 filing pack, prepared with you
The full 24 data points computed from your bills and meter readings, formatted for the EU Policy Reporting Platform and BAFA RZReg, reviewed together before you sign and submit.
- 02
A capacity readout
Contracted connection vs measured peak: your real headroom, in kW.
- 03
Early access to the filing engine
The software as it ships, shaped by what your filing actually needed.
- 04
Ranking control
Review and correct your NRGRanker listing before it is public; first in line for NRGKit Verified when sensors land.
- 05
Founding pricing, locked
On the software tier now and the verified/hardware tier when you upgrade. Direct access to our team, and a priority slot in the first installation round.
Founding rate
£1,950
per year, billed annually. Capped at fifteen.
When the slots are gone, the founding rate goes with them.
Start a founding conversation →Not sure where you stand? Run the readiness check first →Small print that matters: you remain the filer of record. NRGKit prepares and verifies; you review and sign. If your facility falls under no reporting duty, we will tell you so before taking payment.
Questions before committing? The readiness check takes two minutes, or write to us directly.