One reporting core. National deltas that bite.

The EU defines what every data centre reports. Member states decide who reports, when, and what happens when the numbers miss a cap. These pages track the differences we encode in our filing templates.

European UnionEED (2023/1791) + Delegated Regulation 2024/1364

EED data-centre reporting, explained for operators

Facilities with 500 kW of installed IT load report 24 datapoints annually by 15 May. What counts, who is in scope, and what the second cycle demands.

Read the jurisdiction page →
GermanyEnEfG + BAFA RZReg

EnEfG for data centres: measured PUE or fines

Germany reports at 300 kW net connected power, six weeks before the EU deadline, with hard PUE caps you cannot demonstrate with estimates.

Read the jurisdiction page →
FranceEED transposition, 100 kW threshold

France reports at 100 kW: the server-room threshold

France pulls the EED threshold down to 100 kW, reaching server rooms that have never had an energy manager. Same 24 datapoints, same 15 May.

Read the jurisdiction page →
IrelandEED (500 kW) + CRU large energy user connection policy

Ireland: where the filing meets the grid queue

EED reporting at 500 kW, plus the CRU connection policy that makes measured load evidence a condition of growth. Under 1 MVA is exempt, if you can prove it.